Message boards : Number crunching : Keep getting tasks with impossible deadlines
Author | Message |
---|---|
awdorrin Send message Joined: 2 Apr 20 Posts: 4 Credit: 18,986,927 RAC: 0 |
I have over 200 tasks sitting at 'Ready to Start' and all of them have a deadline between 9:39 and 9:40pm tonight. (It is currently 8:27 PM) I have 20 tasks currently running, all with 2-5 hours remaining, and they all are due between 8:19pm and 9:40pm. Why does Rosetta/BOINC keep downloading tasks with impossible deadlines? |
Admin Project administrator Send message Joined: 1 Jul 05 Posts: 4805 Credit: 0 RAC: 0 |
I think this issue should be resolved now. I updated the scheduler to hopefully send a reasonable number of jobs now. |
awdorrin Send message Joined: 2 Apr 20 Posts: 4 Credit: 18,986,927 RAC: 0 |
Thanks - I see that the pending tasks all aborted starting at 9:38pm. I'll keep an eye to see what happens over the next few days. |
Sid Celery Send message Joined: 11 Feb 08 Posts: 2123 Credit: 41,204,457 RAC: 10,266 |
I have over 200 tasks sitting at 'Ready to Start' and all of them have a deadline between 9:39 and 9:40pm tonight. (It is currently 8:27 PM) It looks like you've got 230 tasks on your 24-core PC and they run to the default 8hrs. That's 80hrs work if you run 247, but the deadline is 3 days (72hrs) It looks like your cache is a little too large (3 days?) so that every task you call down will miss deadline. I think the maximum cache you can have is 2.5 days (that is, with 2.49 days left, another 8hr task will be downloaded and in theory be returned 2.82 days later, allowing a little leeway) Does that make sense at your end? |
Message boards :
Number crunching :
Keep getting tasks with impossible deadlines
©2024 University of Washington
https://www.bakerlab.org